Close Menu
economyuae.comeconomyuae.com
    What's Hot

    Avoid the Spam Folder: Email Deliverability Tips You Can’t Ignore

    March 26, 2026

    Seasonal Email Strategies That Drive Sales Without Feeling “Salesy”

    February 18, 2026

    How Lily Launched a Custom Clothing Brand Alongside a Full-Time Job

    February 16, 2026
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram
    economyuae.comeconomyuae.com
    Subscribe
    • Home
    • MARKET
    • STARTUPS
    • BUSINESS
    • ECONOMY
    • INTERVIEWS
    • MAGAZINE
    economyuae.comeconomyuae.com
    Home » DEWA begins trial operations at Dhs1.42bn Hatta hydroelectric power plant
    BUSINESS

    DEWA begins trial operations at Dhs1.42bn Hatta hydroelectric power plant

    Arabian Media staffBy Arabian Media staffOctober 7, 2025No Comments3 Mins Read
    Facebook Twitter LinkedIn Telegram Pinterest Tumblr Reddit WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest Email


    HE Saeed Mohammed Al Tayer, MD and CEO of Dubai Electricity and Water Authority (DEWA)

    HE Saeed Mohammed Al Tayer, MD and CEO of Dubai Electricity and Water Authority (DEWA) during his visit of the hydroelectric power plant in Hatta/Image: Supplied

    HE Saeed Mohammed Al Tayer, MD and CEO of Dubai Electricity and Water Authority (DEWA), has announced the start of trial operations and electricity export from the pumped-storage hydroelectric power plant in Hatta to Dubai. The announcement came during his visit to the project site to review progress in the final stages of work. During operational testing, the plant generated more than 17,921 megawatt-hours of electricity.

    The Hatta hydroelectric plant will have a production capacity of 250 megawatts (MW), a storage capacity of 1,500 megawatt-hours, and a lifespan of up to 80 years. Peak electricity demand in Hatta is approximately 39 MW, with the surplus to be exported to Dubai.

    Al Tayer was accompanied by Nasser Lootah, Executive Vice President of Generation (Power & Water) at DEWA; Khalifa Al Bedwawi, Project Manager; and other members of the project team.

    Al Tayer affirmed that the project aligns with the vision of HH Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the UAE and Ruler of Dubai, to achieve comprehensive and sustainable development across the emirate. It also supports the Dubai Clean Energy Strategy 2050 and the Dubai Net-Zero Carbon Emissions Strategy 2050, which aim to provide 100 per cent of Dubai’s total energy production capacity from clean sources by 2050.

    During the visit, Al Tayer toured the underground power generation station, built 60 metres below ground level, and inspected the operation of the two main water valves, each weighing around 110 tonnes. He also visited the station’s command and control centre and observed operational tests for water pumping and power generation.

    Read: Saeed Al Tayer on DEWA’s clean energy and AI transformation

    The visit included the upper dam, constructed by DEWA as part of the project, featuring a total water surface area of 210,000 square metres. The dam comprises two compressed concrete walls — a main wall measuring 72 metres in height and 225 metres in length, and a side wall 37 metres high. The upper dam has a storage capacity of approximately 5.3 million cubic metres (1,166 million gallons) of water.

    Al Tayer highlighted that the Dhs1.42bn hydroelectric plant forms part of DEWA’s broader efforts to diversify Dubai’s clean energy portfolio. These include technologies such as solar photovoltaic panels, concentrated solar power, and energy storage in batteries.

    The plant generates electricity by using water stored in the Hatta Dam and upper dam, operating with a turnaround efficiency of 78.9 per cent. Water stored in the upper dam flows through a 1.2-kilometre subterranean tunnel, converting potential energy into kinetic energy that drives turbines to produce electricity. Power can be supplied to DEWA’s grid within 90 seconds to meet demand.

    To store energy, clean power generated at the Mohammed bin Rashid Al Maktoum Solar Park will be used to pump water back to the upper dam, converting electrical energy into kinetic energy — a process that ensures sustainable, renewable energy storage for decades to come.






    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
    Previous ArticleMubadala Energy cuts greenhouse gas emissions by 36.5% in 2024
    Next Article Client Challenge
    Arabian Media staff
    • Website

    Related Posts

    Dubai to implement mandatory marine traffic management plan

    December 15, 2025

    Here’s what to expect this week

    December 15, 2025

    IHC raises stake in Invictus Investment to about 40%

    December 15, 2025
    Add A Comment
    Leave A Reply Cancel Reply

    Top Posts

    10 Trends From Year 2020 That Predict Business Apps Popularity

    January 20, 2021

    Shipping Lines Continue to Increase Fees, Firms Face More Difficulties

    January 15, 2021

    Qatar Airways Helps Bring Tens of Thousands of Seafarers

    January 15, 2021

    Subscribe to Updates

    Your weekly snapshot of business, innovation, and market moves in the Arab world.

    Advertisement

    Economy UAE is your window into the pulse of the Arab world’s economy — where business meets culture, and ambition drives innovation.

    Facebook X (Twitter) Instagram Pinterest YouTube
    Top Insights

    Top UK Stocks to Watch: Capita Shares Rise as it Unveils

    January 15, 2021
    8.5

    Digital Euro Might Suck Away 8% of Banks’ Deposits

    January 12, 2021

    Oil Gains on OPEC Outlook That U.S. Growth Will Slow

    January 11, 2021
    Get Informed

    Subscribe to Updates

    Your weekly snapshot of business, innovation, and market moves in the Arab world.

    @2025 copyright by Arabian Media Group
    • Home
    • Markets
    • Stocks
    • Funds
    • Buy Now

    Type above and press Enter to search. Press Esc to cancel.